Princess F62 Retrofit

We take great pride in showcasing this exceptional Princess F62 Retrofit project, ‘HANSA’, a remarkable retrofit undertaken by PR Nautica during the vibrant season of Spring in 2022. This retrofit project included a range of enhancements that truly elevated the vessel to new heights of performance and luxury.

Central to the project was the installation of a second Generator, augmenting the power capabilities of the yacht and ensuring a seamless and uninterrupted supply of power. This strategic addition enhances the vessel’s functionality and provides a heightened level of convenience, allowing for extended journeys and increased comfort.

In addition to the second Generator, the ‘Hansa’ retrofit project included the integration of a Cockpit 3rd Station, offering unparalleled control and maneuverability from the stern of the yacht. This cutting-edge feature grants the captain enhanced visibility and accessibility, facilitating seamless docking and precise handling in any maritime setting.

Furthermore, the incorporation of the Xenta Joystick Control System further amplifies the ease and precision of maneuvering the Princess F62. With intuitive and responsive joystick controls at their fingertips, the captain gains effortless command over the vessel, resulting in smooth and confident navigation.

But the enhancements didn’t stop there. This Princess F62 Retrofit project embraced an array of additional elements, carefully selected to enhance the overall yachting experience. From advanced navigation systems to bespoke interior finishes and state-of-the-art entertainment systems, every aspect was meticulously considered to ensure unrivaled comfort and enjoyment.

Second Generator

Supply and fit a second Onan 13.5kW generator complete with change over switch in the Lazerette. This included the manufacture of a powder coated frame to allow mounting of the second generator above the standard generator. The install ensured good service access whilst not compromising on valuable storage space. 

Cockpit 3rd Station

Supply and fit the factory option Cockpit 3rd Station, including throttles, thrusters, anchor control, and emergency stops. This involved cutting out the area to the side coaming and mounting in the factory made moulding cassette and then installing all services.

Xenta Joystick Control

Supply and installation of an Xenta Dual Station joystick control system to control the engines and thrusters. Even in the most challenging mooring conditions i.e. tight spaces, high winds or strong currents, even tricky, awkward maneuvers feel safe and straightforward.

Flybridge Awning

Supply and fit a grey sunbrella electric awning from back of hardtop. Included work to cut out the aft section of the hardtop and inserting new offset stiffening to allow accommodation of garage for the awning. Required a post-fit respray of the hardtop.

Walnut Flooring

Supply and fit walnut flooring to the aft dining area (random walnut as used to match galley and helm).

Backlit Name

Supply and fit mirror polished 316 stainless steel letters with single colour (COOL WHITE) illumination. ‘HANSA’. Letter height 280mm. Installed along with a stainless steel port of registry ‘CIYS – COOK ISLANDS’ at 100mm letter height.

Tender Installation

Receive, commission, launch and load Williams Jet Tender to bathing platform. Includes custom made teak chocks, stainless tie down eyes (removable) and lashing straps.

More...

  • Watermaker 130lts/hr with auto-flush and remote
  • 12-bottle Winecooler in Saloon
  • x8 Lumishore TIX803 Underwater Lights
  • Raymarine HD Color Radar
  • Wi-Fi Router
  • FWD Cabin TV Upgrades
  • Crew Cabin Aircon Install
  • Foredeck Table with removable legs
  • Raymarine Fish Finder